Commercial paving & striping in 38+ U.S. metros

Pinnacle Asphalt Paving

Asphalt Paving

Professional asphalt paving for driveways, parking lots, roads, and commercial properties. We deliver smooth, durable surfaces built to handle heavy traffic, weather, and everyday use.

Asphalt paver laying hot mix asphalt with crew members guiding the screed

Scope of work

  • Full-depth new construction and overlays
  • Subgrade evaluation and base stabilization
  • Heavy-duty mix designs for truck and equipment traffic
  • Grading corrections for proper drainage

What your proposal includes

  • Measured quantitiesSquare footage & tonnage
  • Mix & materialsSpecified by application
  • Phasing planKeeps site operational
  • ScheduleMobilization to handover
  • TurnaroundTypically 48 hours
Start a scope

How we work

A five-stage delivery process

Predictable execution from first walkthrough to final striping — documented at every stage.

  1. 01

    Site assessment

    We walk the property, measure square footage, document distress, and identify drainage and subgrade issues before quoting.

  2. 02

    Scope & proposal

    You receive a written scope with quantities, mix specs, phasing plan, and pricing — typically within 48 hours.

  3. 03

    Preparation & milling

    Failed areas are milled or removed, base is repaired and compacted, and utilities and grades are protected.

  4. 04

    Paving & compaction

    Hot mix is placed at spec temperature and rolled to target density for a smooth, durable, water-shedding surface.

  5. 05

    Striping & handover

    Layout is restriped to code including ADA stalls and traffic flow, followed by a documented final walkthrough.

FAQ

Asphalt Paving questions

How quickly can you provide a proposal?

Most commercial proposals are delivered within 48 hours of the site assessment. Multi-site or phased programs may take slightly longer because each location is measured and scoped individually.

Can you keep our property open during construction?

Yes. We phase most commercial projects so access, loading, and fire lanes remain usable. Night and weekend work windows are available in every market we serve.

Are you licensed, insured, and able to meet vendor requirements?

Our crews carry general liability and workers' compensation coverage in the markets where they operate, and we regularly complete vendor onboarding, insurance certificates, and safety documentation for property management and industrial clients.

How long does new asphalt need before traffic?

Passenger traffic is typically allowed within 24 to 48 hours depending on temperature and mat thickness. Heavy truck traffic and sealcoating require longer cure windows, which we confirm in your project schedule.

Get your asphalt paving proposal

Request a site assessment and receive a written scope with quantities, phasing, and pricing — typically within 48 hours.

Find your market Get estimate